Normal Operations Resume at Rochester Airport After Gas Line Struck

Authorities say normal operations have resumed at the Rochester airport after a contractor using heavy equipment hit a gas line. 

The arrivals road and ramp garage were shut down for 20 minutes around 8 a.m. 

Flight operations were not affected. Rochester Gas and Electric responded to repair the damaged gas line.


Sponsored Content

Sponsored Content