Second Phase of Preservation Work Set For This Summer at George Eastman Mansion

The second phase of ongoing preservation work is set for this summer at the George Eastman mansion.

 In June, work will begin to restore the East Porch. The porch and East Vista will be closed to the public. The only access to the Terrace Garden will be from inside the George Eastman Museum and will be included with museum admission.

Because of the construction work, the Museum will not host its annual Garden Vibes summer concert series this year.


Sponsored Content

Sponsored Content